New horizons

PHEW! What a scorcher. Quite a change in the weather in the last week. At the lagoon, several new views have opened up as a result of the North embankment desecration.

20130503-060204

Looking towards the housing development in Callaghan Drive and The Steel works- note the slick of embankment soil junk that has collected alongside the flocculation contraption.

20130503-060617

Wot no trees

 

20130503-060717

Looking East, you can see where this is going.

20130503-061008

More spoil into the water from the contaminated North embankment

 

20130506-131401

The 3 amigos on the North embankment

 

Napoleon and Bonaparte continue to excavate and load up the little guy for tipping.

20130506-131354

 

20130506-132116

20130506-131535

Wee Willy dumps his load

Of course this is all for future “site investigation” purposes. Will they find any white phosphorus now that this lot has been churned up to the extent it now has been- especially if it is conveniently shovelled under the surface and some new soil added over the top. Then the so called “samples” of these future investigations will sample shallow ground- not finding anything.

Over the weekend, the newly constructed causeway path was covered over with plastic blowing in the wind- perhaps to stop the handful of birds nesting? Now it’s removed, it forms the bridge over troubled water for the excavation crew to continue their work.

20130503-061025

 

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *